LeasingHub 洽租

YKK Building Phase 3 吉田大廈第三期

  • Industrial Space
  • 2 San Lik Street
  • Tuen Mun

YKK Building Phase 3 吉田大廈第三期

  • Industrial Space
  • 2 San Lik Street
  • Tuen Mun

YKK Building Phase 3 is a 22-storey grade A Industrial Building situated in 2 San Lik Street.

Its total GFA is approximately 8,300,000 sq.ft.. It has 2 passenger lifts.

YKK Building Phase 3 is a single ownership Industrial Building with workshop/ offices available for rent.

  • Workshop
    Type
  • 35 Years
    Age
  • A
    Grade
Usage Industrial (For Rent)
No. of Storeys
  • 22 (Above Ground)
Year Completed 1991
Ownership Single Landlord
Total GFA 8,300,000 ft²
Air Conditioning
  • Independent A/C
Management Fee
  • €0.10
  • per ft²
  • (Last Updated: 2024)
Elevator
  • 2 (Passenger)
Management Company JLL Management Services Ltd
MTR
  • Tuen Mun - Within 15 minutes walk
Carpark (Inhouse)
  • Open to Public
  • Hourly
Loading & Drop off Facilities
  • Loading/Unloading Area
Nearby Carpark
  • Tuen Mun Industrial Centre Block A - 0.11 km
  • YKK Building Phase 2 - 0.02 km
Nearby Hotel
  • Pentahotel Hong Kong Tuen Mun - 0.44 km
  • Hotel COZi Resort - 0.44 km
Airport
  • Hong Kong International Airport - 10.53 km
  • Macau Int'l Airport - 47.5 km
  • Shenzhen Baoan Int'l Airport - 31.28 km
Intercity Railway Station
  • Hong Kong West Kowloon Station - 22.55 km
  • Shenzhen North Station - 24.89 km
Last Updated 2026-05-02
Ref. B0017489

Current Listings

Recommended Consultants

Bowie Sieto 司徒卓齡
MBus, Executive Director (Leasing & Investment)
E-259182

"She is a good listener"

Bowie is a good listener and She knows the market well.

  • 4.8 / 5.0
Samuel Lo 盧振曜
MA, Director (Leasing & Investment)
E-462341

"Solution Provider"

I would like to give 5 Star to Samuel for helping me to get a rite place for my Prajna Yoga Center, we are looking for the certain sqft with water supply for showers and non centralised air condition,thought of the solution, which could solve the 3 important issues that we countered after the first viewing: 1. size, 2. water pipe installable as we must have bathroom in our yoga Centre, 3. no extra cost of central air conditioning during holiday and after-office hour. He successfully proposed landlord that we could subdivide captioned portion unit of restaurant/shop shown on the plan, which could make the size enough, bathroom installable as it’s close to public toilet. And as the building was just remodeled, we could also install split-type A/C so that we can save a lot by not paying extra central A/C.He work very smart , if you are looking place for your business don’t hesitate to consider his service.for me he is the best .

  • 4.9 / 5.0
Kumar
Prajna Yoga Ltd
Elaine Tang 鄧綺玲
MSc(Real Estate), Manager (Leasing & Investment)
E-337194

"Highly recommend"

5 stars! If you are looking for a professional, passionate, and reliable leasing agent, look no further!

  • 5.0 / 5.0
Raymond Hui 許瑋麟
Director (Leasing & Investment)
S-428210

"Thanks so much for the service"

Thanks so much for the great, friendly and professional service. Raymond is very helpful and gave me good advices. I am very satisfied.

  • 4.6 / 5.0
Mr Alan Tsang

57 Total Reviews with an average rating of 4.2 / 5.0

See all reviews

Latest Transaction

Related News

2024-04-26

工廈地廠頻錄電動車品牌承租 逾萬呎樓面受捧 租金加幅逾10%

隨着疫市過去,近年物流倉儲業發展放緩,租金受壓,電動車品牌發展卻一枝獨秀,頻吼準大面積地廠,相繼擴展規模,增加額外樓面,部分並錄提價逾10%承租。 電動車盛行,預期未來日子主導市場,相關品牌亦紛...

More news about YKK Building Phase 3

Nearby Buildings

Frequently Asked Questions

YKK Building Phase 3, 2 San Lik Street, Tuen Mun, New Territories

€1.3 / ft²

This building using Gross Area to measurement size, the effective ratio is about 60 - 70%.

Properties Comparison

{{ JText._(mode === 1 ? 'COM_HUB_PAGE_RESULT_EMPTY_GENRAL' : 'COM_HUB_PAGE_RESULT_EMPTY_COMPARISON') }}