LeasingHub 洽租

YKK Building Phase 3 吉田大廈第三期

  • Industrial Space
  • 2 San Lik Street
  • Tuen Mun

YKK Building Phase 3 吉田大廈第三期

  • Industrial Space
  • 2 San Lik Street
  • Tuen Mun

YKK Building Phase 3 is a 22-storey grade A Industrial Building situated in 2 San Lik Street.

Its total GFA is approximately 8,300,000 sq.ft.. It has 2 passenger lifts.

YKK Building Phase 3 is a single ownership Industrial Building with workshop/ offices available for rent.

  • Workshop
    Type
  • 35 Years
    Age
  • A
    Grade
Usage Industrial (For Rent)
No. of Storeys
  • 22 (Above Ground)
Year Completed 1991
Ownership Single Landlord
Total GFA 771,095.23 m²
Air Conditioning
  • Independent A/C
Management Fee
  • HK$11.80
  • per m²
  • (Last Updated: 2024)
Elevator
  • 2 (Passenger)
Management Company JLL Management Services Ltd
MTR
  • Tuen Mun - Within 15 minutes walk
Carpark (Inhouse)
  • Open to Public
  • Hourly
Loading & Drop off Facilities
  • Loading/Unloading Area
Nearby Carpark
  • Tuen Mun Industrial Centre Block A - 0.11 km
  • YKK Building Phase 2 - 0.02 km
Nearby Hotel
  • Pentahotel Hong Kong Tuen Mun - 0.44 km
  • Hotel COZi Resort - 0.44 km
Airport
  • Hong Kong International Airport - 10.53 km
  • Macau Int'l Airport - 47.5 km
  • Shenzhen Baoan Int'l Airport - 31.28 km
Intercity Railway Station
  • Hong Kong West Kowloon Station - 22.55 km
  • Shenzhen North Station - 24.89 km
Last Updated 2026-05-02
Ref. B0017489

Current Listings

Recommended Consultants

Elaine Tang 鄧綺玲
MSc(Real Estate), Manager (Leasing & Investment)
E-337194

"This is my second time renting through Elaine. As reliable as always, Elaine consistently put the client’s best interest first."

  • 5.0 / 5.0
Iris Lau 劉汶珊
Senior Manager (Leasing & Investment)
E-453399

"盤源多,服務到位!"

  • 4.5 / 5.0
Cynthia Lau 劉嘉遙
Manager (Occupier Services)
S-713279

"We gave Cynthia a very tight timeline with a challenging budget. She delivered beyond what we thought was possible, finding us a quality space in a prime building without compromising on any of our key requirements."

  • 4.9 / 5.0
Bowie Sieto 司徒卓齡
MBus, Executive Director (Leasing & Investment)
E-259182

"Bowie switch three languages fluently during our inspection which our is very impressive"

I was looking for an agent who can speak English and mandarin fluently since my company speaks three languages. And we find Bowie. I was a little worry before our inspection and it turns out Bowie is able to switch three languages fluently during our inspection which our is very impressive to me and Our group CEO is very happy with Bowie's service. Very Professional!

  • 5.0 / 5.0
Shawn Wang

57 Total Reviews with an average rating of 4.2 / 5.0

See all reviews

Latest Transaction

Related News

2024-04-26

工廈地廠頻錄電動車品牌承租 逾萬呎樓面受捧 租金加幅逾10%

隨着疫市過去,近年物流倉儲業發展放緩,租金受壓,電動車品牌發展卻一枝獨秀,頻吼準大面積地廠,相繼擴展規模,增加額外樓面,部分並錄提價逾10%承租。 電動車盛行,預期未來日子主導市場,相關品牌亦紛...

More news about YKK Building Phase 3

Nearby Buildings

Frequently Asked Questions

YKK Building Phase 3, 2 San Lik Street, Tuen Mun, New Territories

HK$113.0 / m²

This building using Gross Area to measurement size, the effective ratio is about 60 - 70%.

Properties Comparison

{{ JText._(mode === 1 ? 'COM_HUB_PAGE_RESULT_EMPTY_GENRAL' : 'COM_HUB_PAGE_RESULT_EMPTY_COMPARISON') }}