Two Exchange Square 交易廣場第二座
- Office Building
- 8 Connaught Place, Pedder Street, Harbour View Street
- Central
Two Exchange Square 交易廣場第二座
- Office Building
- 8 Connaught Place, Pedder Street, Harbour View Street
- Central
Two Exchange Square 交易廣場第二座
- Office Building
- 8 Connaught Place, Pedder Street, Harbour View Street
- Central
Two Exchange Square is a 50-storey double A Commercial Building located at the junction of Connaught Place, Pedder Street and Harbour View Street just 2-mins walk from Hong Kong MTR station (Exit E2). It has covered link to MTR station and elevated footbridge system making it very convenient in accessing everywhere in Central for working and shopping. There is a retail podium beneath. Large scale infrastructure including Airport Express Hong Kong station, Central Ferry Piers and Hong Kong–Macau Ferry Terminal are close away. Grade A buildings like One Exchange Square, The Forum and Three Exchange Square are in its close vicinity.
Its total GFA is approximately 162,000 sq.ft. with 45 office floor (5-49/F) and 4 retail floor (1-4/F). It has 24 passenger lifts and 2 cargo lifts. There is a communal garden with spacious outdoor seating providing a perfect space for casual meet-ups and creative exchange. To comply with the sustainable green practices in improving energy efficiency and environmental management, Two Exchange Square has achieved BEAM Plus EB V2.0 - Final Platinum rating. Coffee lounge is available at the lobby.
Two Exchange Square is a single ownership Commercial Building with offices of 866 - 13106 sq.ft. on net available for rent. Occupiers are mostly from Banking & Finance, Law Firm, Asset Management and Securities.
| Usage | Office (For Rent) |
|---|---|
| No. of Storeys |
|
| Year Completed | 1984 |
| Ownership | Single Landlord |
| Developer |
|
| Total GFA | 162,000 ft² |
| Typical Floor Area | 12,000 - 14,000 ft² |
| Floor System | Underfloor trunking |
| Air Conditioning |
|
| Management & A/C Fee |
|
| Elevator |
|
| False Ceiliing Height | 2.50 (Meter) |
| Management Company | Hongkong Land Group Ltd |
| Anchor Tenant |
|
| Features | BEAM (Plus EB V2.0 - Final Platinum), Lobby Cafe Lounge, Communal Garden, Elevated Footbridge System, Airport Express Hong Kong station, Central Ferry Piers, Hong Kong–Macau Ferry Terminal, Floor Loading (3kPa), Covered Link with MTR, Non-Ground Level Lift, Commercial Podium |
| MTR |
|
| Carpark (Inhouse) |
|
| Loading & Drop off Facilities |
|
| Nearby Carpark |
|
| Nearby Hotel |
|
| Airport |
|
| Intercity Railway Station |
|
| Last Updated | 2026-05-02 |
| Ref. | B0001197 |
Current Listings
Latest Transaction
Related News
2-speed recovery hits Central landlords as older towers cut rents to compete
Nexxus Building brings in asset manager, lowers rents and subdivides space to retain tenants...
外資代理行:減息救不了港商廈
本港商業房地產市場受壓,有外資代理行代理表示,雖然市場憧憬美國聯儲局即將減息,惟息口下降只是緩和情況,僅「令債仔稍為舒服,但救不了他」,現時資產價值下跌屬結構性問題,短時間內無法解決,暫時不會因為減息...
港交所豪擲63億 購交易廣場自用物業
在本港寫字樓淡靜市道之下,中環核心商業區卻出現高價轉手交易。港交所 昨天宣布,斥資63億元向中環大地主置地購入中環交易廣場14.7萬方呎樓面作為總部...
HKEX makes One Exchange Square its permanent home with $6.3b multifloor purchase
Hong Kong Exchanges and Clearing (0388) on Thursday said it has entered into an agreement with Hongk...
港商廈去年租值較高位瀉25% 長江中心、中環中心4年挫3成
寫字樓市況前景未明朗。據中原統計,34個頂級及甲級指標寫字樓的差餉租值,2023年整體寫字樓的租值按年跌2.1%,雖然跌幅收窄,但連跌4年,顯示經濟環境疲弱及空置率高企,寫字樓租務市況持續下調。當中,...